Major breakthrough by BRO in Arunachal tunnel construction

 

by IANS |

New Delhi, Oct 14 (IANS) In a major breakthrough amidst the pandemic by the Border Roads Organisation (BRO) in the Sela Tunnel Project in Arunachal Pradesh, the breakthrough blast for the longer tunnel of 1.5 km length was done successfully on Thursday.

The tunnel at an altitude of 13,000 feet above sea level would provide all-weather connectivity to Tawang and is being constructed by the 42 Border Roads Task Force (BRTF).

The foundation stone of the tunnel project was laid in February 2019 by Prime Minister Narendra Modi.

The project comprises of two tunnels of total 2.5 km length and 9 km approach roads.

Despite delays due to Covid, the project has progressed at a fast pace, BRO officials associated with the project told IANS.

Upon completion, the tunnel will be the longest bi-lane tunnel project above the height of 13,000 feet and will reduce the travel time between Tezpur and Tawang by more than an hour.

The project is estimated to cost Rs 687 crore and is expected to be completed in the next three years.

It covers a total distance of 12.04 km and consists of two tunnels of 1,790 and 475 metres each.

Latest News
India, Saudi Arabia take stock of West Asia situation, to ensure supply chain continuity Sat, Apr 11, 2026, 04:31 PM
Bangladesh name unchanged 15-member squad for first two ODIs vs NZ Sat, Apr 11, 2026, 04:29 PM
Political row erupts over Nripendra Misra's remarks on 1990s Ayodhya decisions Sat, Apr 11, 2026, 04:23 PM
Untrustworthy Pakistan milked US for billions, now betrays Saudi Arabia: Report Sat, Apr 11, 2026, 04:22 PM
India-Israel ties set to grow stronger with deeper social engagement: Report Sat, Apr 11, 2026, 04:21 PM